首页 社会内容详情
以太坊块高度开奖:Pansar eyes key role in state development

以太坊块高度开奖:Pansar eyes key role in state development

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

以太坊块高度开奖www.326681.com)采用以太坊区块链高度哈希值作为统计数据,以太坊块高度开奖(联博统计)数据开源、公平、无任何作弊可能性。联博统计免费提供API接口,支持多语言接入

Pansar's chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.

KUCHING: Pansar Bhd is eyeing more key infrastructure projects listed by the Sarawak government in its Post Covid-19 Development Strategy 2030 (PCDS 2030).

Its chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.

Among the initiatives and major projects planned under PCDS 2030 that were highlighted by Sarawak Premier Datuk Patinggi Abang Johari Tun Openg at its launch in July 2021 are the development of autonomous rail rapid transit Kuching Urban Transportation System (estimated cost of more than RM5bil), expansion of terminals at the Kuching and Sibu Airports and new deep sea ports at Kuching and northern Sarawak.

The new key industrial projects include the development of Petrochemical Hub and bio-industrial park in Bintulu, which is currently underway, as well as free industrial zones around the new deep sea ports as well as a furniture park and extension of the Samajaya Hi-Tech Park.

To support the industrial development, a Pan Sarawak gas pipeline will also be built.

The PCDS 2030 has seven strategic thrusts and is anchored on six economic sectors as the main engines of growth, which will be supported by seven enablers.

,

皇冠体育规则www.hg9988.vip)是一个开放皇冠网址即时比分、皇冠网址代理最新登录线路、皇冠网址会员最新登录线路、皇冠网址代理APP下载、皇冠网址会员APP下载、皇冠网址线路APP下载、皇冠网址电脑版下载、皇冠网址手机版下载、皇冠体育规则解说的官方平台。

,

Tai said Pansar is currently constructing the Batang Lupar bridge, the longest riverine bridge in Malaysia, in Samarahan Division.

The Batang Lupar bridge, with a contract value of RM848.8mil, is one of the nine major bridges to be built under the Sarawak coastal road network which stretches a massive 896km. Several other bridges are also in various stages of construction

The on-going 225km Second Trunk Road project will become an alternative road to the Sarawak Coastal Road and Pan Borneo Highway network which will significantly shorten the travelling time from Kota Samarahan to Sibu.

Most of the work packages under Pan Borneo Highway Sarawak are due for completion this year.

Tai said other notable infrastructure projects Pansar is implementing now are the Universiti Malaysia Sarawak Teaching Hospital (worth RM486mil), mechanical and engineering works on the Shell Headquarters in Miri and retrofitting of the Sarawak Timber Industry Development Corp building in Kuching.

Pansar’s total order book for these projects (including Batang Lupar bridge) is RM1.4bil.

  • 皇冠体育官网 @回复Ta

    2023-05-26 00:08:07 

    勇士先发阵容只会更老化,这让本季影响力依然超群的柯瑞,很难再重返总冠军赛。总教练科尔坦承目前勇士并非冠军等级球队,「这一年起伏很大,有各式各样的状况发生,面临许多逆境,但我们始终团结一心拼到了最后,取得了相当好的成绩。」人物关系好清楚

发布评论