首页 体育内容详情
欧博官网(www.aLLbet8.vip):Fukushima debris removal delayed by another year

欧博官网(www.aLLbet8.vip):Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

欧博官网www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠网址appwww.hg108.vip)是一个开放皇冠官方网址代理APP下载、皇冠官方网址会员APP下载、皇冠官方网址线路APP下载、皇冠官方网址登录APP下载的官方平台。皇冠体育官方网址APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育网址APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论